Explore our portfolio to see how we can bring your
construction project to life with precision and care. Contact us today for a consultation!
Career Project Highlights
- Tiffany & Co. Flagship Store Renovation—$600 Million (Structure Tone, 2022–2024): Delivered site safety consulting on this high-profile Fifth Avenue renovation, overseeing complex logistics involving equipment hoisting and safety compliance in one of New York’s most iconic retail locations.
- Citibank Flagship Renovation—$3 Billion (CRSG, 2013–2022): Provided construction inspection and site safety consulting on this Tribeca mega-project, including engineering design and controlled inspections. Acted in multiple executive and safety roles throughout the project’s lifecycle.
- 40-Floor Office Tower (7 Bryant Park Midtown, NY)—$275 Million (Turner Construction, 2013–2014): As Senior Superintendent, Anthony managed tradespeople and brought the structure out of the ground ahead of schedule. He managed requisitions, led site safety protocols, and drove field coordination to meet deadlines.
- Boutique Midtown Hotel (Hotel 31 Midtown, NY)—$165 Million (Renotal Construction, 2011–2013): Serving as Construction Executive, Anthony launched the project, negotiated trade buyouts, and steered all phases to early and under-budget completion. The project achieved a flawless safety record under his leadership.
- Borgata Casino and Hotel Resort—$1.2 Billion (Tishman Construction, 2000–2004): Recruited from Bovis to launch and oversee this 4 million square foot resort development in Atlantic City. Directed the installation of over 4,000 piles and 1,500 pile caps for the hotel foundation, coordinated the 43-floor rebar structure, and led the construction of six casino-floor restaurants. Anthony remained on-site through Temporary Certificate of Occupancy (TCO), ensuring seamless execution and issue resolution.
- Manhattan School of Music—$150 Million (Bovis Lend Lease): Brought this 21-story concrete building out of the ground and topped it off ahead of schedule, while resolving extensive field and architectural challenges.
- American Museum of Natural History—$230 Million (Bovis Lend Lease): Managed the integration of HVAC and electrical systems in secured zones and directed MEP and architectural trades.
- Pratt University Higgins Hall—$25 Million (Bovis Lend Lease): Led renovation of this 100-year-old landmark, orchestrating all architectural, structural, and MEP trades with an flawless safety record.
- Rockefeller University Research Lab—$70 Million (Morse Diesel/AMEC): Oversaw the facade installation of limestone, granite, and curtain walls on a 15-story lab facility, resolving coordination issues to maintain scheduling.
- Brooklyn Children’s Psychiatric Center—$45 Million (Full Spectrum): Managed all MEP systems from underground through occupancy, including kitchen and control systems, ensuring mechanical room readiness and system performance.
- Madison Square Garden–$250 Million Renovation (Herbert Construction): Directed the construction of new locker rooms and resolved nuanced field issues in one of NYC’s most complex, occupied renovation sites.
- Shearson Tower—$420 Million (Herbert Construction): Oversaw the curtain wall, elevator systems, and mechanical rooms on this skyscraper project through to TCO, navigating a highly technical construction environment.